small scale stone crushing plant

Our company developed a number of columns of small scale stone crushing plant, high quality products, here is what you should be reasonable to use it.

How rational use of jaw crusher?

1.A reasonable use of the relevant details of the jaw crusher:

Hydraulic electrical interlocking system of jaw crusher shall not be removed under any circumstances. This is to ensure the safe operation of equipment.When the machine is in operation, when the inner surface of revolution jaw crusher is not allowed to stand.When the machine is running, the operator shall hand is to get into the machine inside chunks of ore or other related items.Jaw crusher feed size should not exceed 0.85 times the mine to the port size.Jaw crusher must load movement.Jaw crusher is suitable for crushing hard, medium hard ore crushing and the broken, do not use inappropriate materials (such as over crushed material) its splintered, to avoid unnecessary damage.

2.Equipment inspection and preparation before running:

Before starting the crusher must first check all lubrication points are normal, there is no blockage, leakage and other phenomena.Operating handle dry pump enough oil so that all lubrication points and then refuel.For each meter to check to see if it is intact.The port of discharge to be adjusted to the appropriate scale.Check whether the ore crushing cavity or other objects, such as broken.The V-belt and locking spring tension modulation moderate.Check the electrical interlock, lighting as well as the number of connected protection facilities are complete properly.Check the connection bolt is loose phenomenon.

3.Start operating methods:

Start vacuuming system.In the lower part of the process after receiving a signal, load starting jaw crusher.When the jaw crusher is operating normally, and then start trough feeder choose to mine.

4.Parking operations and emergency stop processing methods:

Crusher parking then you must select all the ore will be parking procedure can be carried out after the exclusion.Parking is a choice to be the first stop for the ore system (ie trough feeder).When parking after 5 minutes before proceeding to stop cleaners and water supply systems must not stop after the operation, on the parking cleaners and water supply systems to choose from.

5.When the following conditions, made ​​an emergency stop:

If the main bearings or moving palate abrupt temperature exceeds 80 ℃, then hit the back surface phenomena is bearing can not be sustained for a second, emergency stop.Before or after the thrust plate fracture, emergency stop.Transmission belt bolts or other moving parts to send broken, it would hurt workers may fly out when the emergency stop.Motor smoke "sweep chamber," emergency stop.

Shibang machine hope these details the issues raised above can also cause you enough attention, so that we can smooth and efficient production conducted.

Services

Supply the most current design and technical expertise; Supply parts sales and training service far beyond the initial sale; Your profits with quality parts and expert service.